Custom Cosmetic Packaging: What You Can Change
Every part of a cosmetic pack can be changed, but not every part can be changed at the same cost or the same quantity. Colour, logo, capacity, closure, liner, and surface finish are the six levers.
Standard builds start at 1,000 pcs; custom colour, custom logo, and custom size start at 3,000 pcs. Below is what each lever actually involves, so your first email can carry the right questions.

What You Can Change
|
Lever |
Options |
Starts at |
Lead time impact |
|
Colour |
Natural, tinted, gradient, Pantone-matched, spray-coated, electroplated |
3,000 pcs for custom colour |
None on standard colours; +3-5 days for a matched shade |
|
Branding |
Laser engraving, silkscreen, hot stamping, UV printing, labels |
3,000 pcs |
Runs inside the production window |
|
Capacity |
3 ml to 750 ml across the range; jars 3 g to 100 g |
1,000 pcs on existing moulds |
None on existing moulds |
|
Shape |
Existing moulds, or a new mould from your drawing |
New mould: 25-30 days tooling |
Add 25-30 days before production |
|
Closure |
Lotion pump, fine-mist sprayer, foam pump, airless piston, dropper, disc cap, flip lid, screw cap |
1,000 pcs |
None |
|
Liner and insert |
Frosted glass, food-grade PP, PET, silicone gasket, inner disc, PE foam |
1,000 pcs |
None |
If a lever is not listed here, it is not because we cannot do it - it is because it needs a drawing before it can be quoted. Send the drawing and we will tell you within one working day whether it is a new mould, an insert, or a no.
01 Colour: Match, Coat, or Keep It Natural
There are four ways a colour reaches a pack, and they are not interchangeable.
|
Method |
What it looks like |
Best for |
Watch out for |
|
Material colour |
Pigment in the resin or glass itself |
PP, PET, HDPE bottles; glass in amber or flint |
Not available on clear PETG at small quantities |
|
Spray coating |
Opaque or soft-touch layer on the outside |
Glass bottles, plastic jars, caps |
Chips at the neck seam if the coating is too thin |
|
Electroplating |
Metallic gold, silver, rose gold |
Caps, collars, airless actuators |
Masking is needed at the thread, so the plating does not reach the sealing surface |
|
Pad or gradient print |
Two-tone or ombre effect |
Promotional lines, seasonal SKUs |
Gradient direction must be fixed on the artwork, not decided at the machine |
Match a Pantone reference and we spray a physical colour chip before production. On bamboo, colour is the one lever we advise against forcing: bamboo is a natural material, and the grain and tone shift from batch to batch. Natural, carbonized, or lightly tinted are honest; a dead-flat Pantone match on bamboo is not.
02 Branding: Five Ways to Put Your Logo On
|
Method |
Surfaces |
Effect |
Note |
|
Laser engraving |
Bamboo, wood, anodised aluminium |
Burns the logo into the material, matte and permanent |
No plate charge; cannot rub off in a cosmetic bag |
|
Silkscreen |
Glass, PP, PET, aluminium, tubes |
One or two flat colours, sharp edges |
Best value for line art and text |
|
Hot stamping |
Glass, plastic, paper boxes, caps |
Metallic foil, high perceived value |
Foil colour is chosen from a physical foil card, not a screen |
|
UV printing |
Plastic, tubes, caps |
Full colour, short runs, photographic detail |
Sits on the surface; abrasion resistance confirmed at sampling |
|
Labels |
Any surface |
Full colour, low entry quantity |
Substrate and adhesive chosen for the fill, not for the printer |
Logo placement is confirmed on a dieline, not in an email. You approve the dieline and a decorated physical sample before the production run starts.
03 Capacity and Shape
|
Format |
Range in production today |
Custom size |
|
Bottles |
3 ml to 750 ml |
New mould from your drawing |
|
Jars |
3 g to 100 g |
New mould from your drawing |
|
Tubes |
12-19 mm diameter, 30-200 ml |
Diameter change needs a new head tool |
|
Bamboo shells |
5 ml to 50 ml liner inside |
Liner and shell can be sized independently |
A new shape runs on a 25-30 day tooling cycle before production starts. Drawings come back within 24 hours with the points that will not mould as drawn - wall thickness, draft angle, undercuts - because fixing them at the drawing stage costs nothing and fixing them at the mould stage costs a tool.
04 Surface Decoration
Silkscreen, hot stamping, spray coating, electroplating, UV printing, laser engraving, offset printing, and embossing are all run in-house or at our own bases. The method has to fit the material: electroplating a thin-wall PET bottle distorts the wall, and laser engraving a soft-touch coating burns through it. The full method-by-material matrix is on the printing and finishing page.
05 Closures, Liners and Inserts
|
Component |
Options |
Can be ordered separately |
|
Pumps |
Lotion pump 0.5-2.0 ml per stroke, foam pump, fine-mist sprayer |
Yes |
|
Droppers |
Glass pipette, plastic pipette, bulb or push-button |
Yes |
|
Caps |
Screw cap, disc cap, flip lid, dome cap, bamboo cap, aluminium cap |
Yes |
|
Liners |
Frosted glass, food-grade PP, PET |
Yes, replacement liners ship separately |
|
Sealing |
Silicone gasket, PE foam, induction seal, inner disc |
Yes |
Closures and liners being available on their own matters more than it sounds. A refill programme needs replacement liners two years after the bottle launch, and a brand that changed pump suppliers should not have to rebuy the jar. Both are quoted as separate lines.
How a Custom Order Runs
|
Step |
What happens |
Timing |
|
1. Brief |
You send capacity, material, closure, quantity, and destination country |
Day 0 |
|
2. Drawing |
We return engineering drawings or a dieline with the mouldable points flagged |
Within 24 hours |
|
3. Quotation |
Unit price, MOQ, tooling cost if any, lead time, FOB Shanghai |
With the drawing |
|
4. Sample |
Stock sample free with freight collected, or a decorated sample on a real part |
3-7 days stock, 7-10 days decorated |
|
5. Approval |
You approve the physical sample and the colour chip in writing |
Your side |
|
6. Production |
Moulding, decoration, assembly, in-line leak check, AQL final |
15-25 days |
|
7. Shipment |
Export packing, documents, FOB Shanghai |
2-3 days |
Nothing moves to production on a verbal yes. The approved sample is the reference the whole lot is measured against.
MOQ, Sampling and Lead Time
|
Item |
Standard build |
Custom build |
|
MOQ |
1,000 pcs |
3,000 pcs |
|
What counts as custom |
No change, or existing colour and closure |
Custom logo, custom colour, custom size |
|
Stock sample |
Free, freight collected, 3-7 days |
- |
|
Decorated sample |
- |
7-10 days, sample charge credited against your first bulk order |
|
Bulk production |
15-25 days |
15-25 days after sample approval |
|
New mould |
- |
25-30 days tooling, then production |
|
Price basis |
FOB Shanghai |
FOB Shanghai |
MOQ is counted per model, and models can be combined in one order to reach it. A 1,000 pcs order of three colours still runs, as long as each colour clears the per-colour minimum for that decoration.
What We Need to Quote
|
Item |
Why we need it |
|
Capacity and format |
Decides whether an existing mould applies |
|
Material or liner |
Decides the chemistry window and the compliance documents |
|
Closure type |
Decides the neck finish and the leakage test |
|
Decoration method and artwork |
Decides plate cost, MOQ, and proof timing |
|
Quantity per colour |
Decides whether the decoration minimum is met |
|
Destination country |
Decides which test reports and declarations are quoted |
|
Target ship date |
Decides whether tooling fits before your launch |
Send the brief in a single email
Capacity, material, closure, decoration, quantity, destination
And the drawing, the price, and the sampling plan come back together.




